Standards

TIANHUA · STANDARDS & QUALITY

Standards &
Quality Assurance

Clear standards. Documented quality. A defined inspection plan for your transformer project.

Review Tianhua’s management system certificates and prepare the technical evidence needed for EPC procurement, utility review and supplier qualification.

Oil-immersed power transformer product illustration
POWER & DISTRIBUTION TRANSFORMERS
Quality documentation matched to the selected model.

DOCUMENTED MANAGEMENT SYSTEMS

Management system certificates.

Review Tianhua’s quality and environmental management certificate copies. Each document identifies Jiangsu Tianhua Transformer Co., Ltd., the manufacturing-related scope and the printed certificate term.

Tianhua ISO 9001:2015 Quality Management System certificate

Quality Management System

ISO 9001:2015

GB/T 19001-2016 / ISO 9001:2015

Certificate: 064-24-Q-0806-R3-M

Printed term: 19 Mar 2024 – 18 Mar 2027

Issuer: Beijing Standard Certification Centre

View full certificate ↗
Tianhua ISO 14001:2015 Environmental Management System certificate

Environmental Management System

ISO 14001:2015

GB/T 24001-2016 / ISO 14001:2015

Certificate: 064-25-E-0604-R2-M

Printed term: 19 Mar 2025 – 18 Mar 2028

Issuer: Beijing Standard Certification Centre

View full certificate ↗

Management system certificates describe organizational scope; they do not certify every transformer model. The printed terms are subject to the certificates’ surveillance conditions. Request the latest copies and status confirmation for supplier approval.

DEFINE THE TECHNICAL BASIS

The right standard for the selected transformer.

Confirm the product type, destination and purchaser specification before quotation. Applicable editions, acceptance limits and supporting evidence belong in the agreed technical schedule.

RequirementReference for technical reviewConfirm with your enquiry
Power & distribution transformersIEC 60076-1 — General, with applicable parts of the seriesCapacity, voltage ratio, frequency, vector group, impedance, losses and service conditions.
Dry-type transformersIEC 60076-11 — Dry-type transformers, where applicableCooling, insulation, enclosure, temperature rise and any required environmental or fire behaviour classes.
Destination & utility requirementsPurchaser, utility and local requirements specified for the projectRequired standard and edition, approval documents, test categories, inspection hold points and destination.

IEC links describe the reference standards. Conformity and document availability must be confirmed for the selected Tianhua model and order.

FROM MATERIALS TO DISPATCH

Make the inspection plan part of the order.

Tianhua’s manufacturing documentation describes winding, vacuum drying, assembly and finished-product inspection. Build your project review around defined controls and an agreed inspection and test plan.

Tianhua transformer winding, vacuum drying and production equipment
Tianhua production equipment shown in company materials.
01 · Specification review

Confirm the duty, site conditions, drawings, applicable standards and acceptance criteria.

02 · Manufacturing controls

Review material identification and the relevant winding, drying and assembly controls.

03 · Factory inspection

Agree routine test records, witness points and any additional testing before production.

04 · Release & packing

Confirm the documentation, nameplate, marking and packing requirements before dispatch.

Routine test scope to review

  • Winding resistance and voltage ratio / connection checks
  • No-load loss and current
  • Load loss and short-circuit impedance
  • Applicable dielectric tests
  • Oil, tank and accessory checks where applicable

Additional evidence to agree

  • Temperature-rise and impulse test requirements
  • Short-circuit withstand evidence where specified
  • Model, rating and design coverage of existing reports
  • Witness inspection or third-party involvement
  • Report language, format and delivery timing

These are enquiry and inspection-planning topics. The final test list, facilities, schedule and any additional costs depend on the selected design and agreed order.

YOUR PROCUREMENT DOCUMENT CHECKLIST

Build the right document pack.

Use this checklist for supplier qualification and project approval. Request the items your project needs; availability, scope and delivery timing are confirmed with the quotation and order.

01

Company & quality

Supplier qualification

  • Current ISO certificate copies
  • Scope and status confirmation
  • Manufacturer profile

02

Technical proposal

Design review

  • Model datasheet and ratings
  • General arrangement and connection drawings
  • Compliance and deviation schedule

03

Inspection plan

Before production

  • Proposed test list and acceptance criteria
  • Coverage of existing test reports
  • Witness points and inspection notice

04

Release documents

Before dispatch

  • Agreed factory test records
  • Final nameplate and identification data
  • Packing and shipping documentation

For type or special tests, check the report’s model, rating, design and standard coverage against the offered transformer.

BUYER QUESTIONS

Standards & documentation FAQs

Are ISO certificates the same as product approvals?

No. A management system certificate covers the organization and its stated activities. Product conformity requires the applicable model specifications, test evidence and any project approvals.

Can I specify IEC, IEEE or a local utility standard?

Send the exact standard, edition and purchaser specification for technical review. We review the proposed design, deviations and test requirements against that schedule before order confirmation.

Which documents should I request for supplier approval?

Request current management system certificates and status confirmation, the proposed model datasheet, drawings, a compliance schedule and the relevant test reports. Confirm report coverage against the offered rating and design.

Can factory tests be witnessed?

Include witness inspection and third-party requirements in your enquiry. Hold points, notice periods, access arrangements and the inspection schedule need to be agreed before the order is released.

PREPARE YOUR TECHNICAL REVIEW

Request your quality documents.

Complete the form below. In the Comment field, include your company / project, transformer type, capacity, voltage ratio, destination and required standard. List the certificates, drawings or test records you need.

Use the online form to send your request directly to Tianhua. For Phone/Mobile, enter the country code and digits without + or spaces (example: 8618603059650).

Email: [email protected]   ·   Phone: +86 186 0305 9650